Application Type
Patents
Application SubType
PCT
(10) Registration Number and Date
Status
Filed-Accordance of filing date
(180) Expiration Date
(20) Filing Number and Date
PG P/2026/000020 2026.05.27
(40) Publication Number and Date
(86) PCT Filing Number and Date
(87) PCT Publication Number and Date
(85) National Entry Date
(30) Priority Details
CN 202610708583.6
2026.05.21
CN 202610708956.X
2026.05.21
(51) IPC Classes
(74) Representative Name
(EN) Young & Williams Lawyers : Francis Griffin ChambersFirst and Second floors, Tandy Haus (on Waigani Drive Lot 1, Sec 51 Hohola) PO Box 1475, NCD, PNG
(54) Title
(EN) A RAPID DEPLOYMENT DEVICE FOR CONTAINER-TYPE PHOTOVOLTAIC POWER STATIONS
(57) Abstract
(EN)

The present invention provides a rapid deployment device for a container-type photovoltaic power station, comprising multi-layer scissor structures, single-layer scissor structures, a plurality of connecting rods, and a plurality of photovoltaic modules. The multi-layer scissor structures and the single-layer scissor structures are each provided in pairs. One end of each multi-layer scissor structure is hingedly connected to a driving device, and the other end of each multi-layer scissor structure is hingedly connected to one end of the corresponding single-layer scissor structure. Each connecting rod is respectively connected to a hinge point of the multi-layer scissor structure or a hinge point of the single-layer scissor structure, and each photovoltaic module is respectively disposed within a folding space enclosed by the multi-layer scissor structure and the connecting rod, or by the single-layer scissor structure and the connecting rod. In the present invention, a plurality of folding spaces for mounting photovoltaic modules are formed by connecting the multi-layer scissor structures and the single-layer scissor structures on two sides of a frame via the plurality of connecting rods. When the driving device is activated, the multi-layer scissor structures and the single-layer scissor structures rotate, thereby completing rapid deployment of the photovoltaic modules.

(58) Citations
Document Type Date Action
Event NameDateStatus
Filing2026.05.27Filed
PCT National Phase Entry2026.05.27PCT National Phase
Filing2026.10.22Filed