Application Type
Patents
Application SubType
PCT
(10) Registration Number and Date
Status
Filed-Formality Examination
(180) Expiration Date
(20) Filing Number and Date
PG P/2025/000001 2023.04.21
(40) Publication Number and Date
(86) PCT Filing Number and Date
(87) PCT Publication Number and Date
(85) National Entry Date
(30) Priority Details
(51) IPC Classes
(74) Representative Name
(EN) ASHURST - PNG : P.O BOX 850, PORT MORESBY, NATIONAL CAPITAL DISTRICT
(54) Title
(EN) TAILINGS STORAGE FACILITY METHOD AND STRUCTURE
(57) Abstract
(EN)

This invention relates to a method of constructing a tailings storage facility structure, and to a tailings facility structure. The structure comprises a network of sand channel arteries (10) and permeable capillaries extending through tailings (14). The sand channel arteries (10) are continuous in the vertical and one lateral dimension and connect to a decant point or points. The permeable capillaries (12) are connected at their lowest point to a sand channel artery, and are continuous in one lateral dimension. The capillaries (12) transport water from the tailings (14) to the sand channel arteries (10), and the sand channel arteries transport water from the capillaries (12) and the tailings (14), to the water decant point or points.

--
(58) Citations
Document Type Date Action
Event NameDateStatus
Filing2023.04.21Filed
PCT National Phase Entry2023.04.21PCT National Phase
Filing2025.02.13Filed